From 30 kVA to 500 kVA — reliable power, certified protection.

Power Infrastructure

Service Overview

Reliable Power for Industrial & Commercial Facilities

We supply and install diesel generator sets from 30 kVA to 500 kVA for residential, commercial, and industrial clients across Muscat. Our scope extends beyond the generator itself to include the complete power infrastructure: earthing systems, lightning protection, ATS panels, cable containment, and formal commissioning.

Every installation is performed by qualified electrical engineers and tested to Oman standards, with full commissioning documentation provided at handover.

We also handle upgrades to existing electrical panels, MV/LV works, and power factor correction for facilities looking to reduce their electricity costs.

Scope of Work

What’s Included

DG set supply and installation (30 kVA – 500 kVA)
Earthing system design and installation per Oman standards
Lightning arrestor (LPS) installation and bonding
Load testing and performance verification
ATS (Automatic Transfer Switch) panel supply and installation
Cable tray, containment, and cable laying
Commissioning and formal test reports
Compliance certification and as-built documentation

How We Work

Our 4-Step Process

1

Assess

Load calculation, site survey, and power requirements analysis.

2

Design

Single-line diagrams, earthing design, LPS layout, and full BOQ.

3

Execute

Installation by qualified electrical engineers with daily progress updates.

4

Handover

Load testing, commissioning, compliance certification, and as-built drawings.

Why Choose Us

Why Desert Projects for Power Infrastructure

Full-Range Capacity

From small 30 kVA units for villas to 500 kVA systems for industrial facilities — we size and specify the right generator for your actual load, not an oversized one.

Certified Installations

Every installation comes with formal test reports and commissioning certificates. We meet Oman OETC and municipality requirements so you don’t face compliance issues later.

Fast Turnaround

We’ve completed 500 kVA generator installations in 14 days. When your business depends on reliable power, we work to your timeline — not ours.

Common Questions

Frequently Asked Questions

What generator sizes do you install?
We install diesel generator sets from 30 kVA up to 500 kVA for residential, commercial, and industrial sites. We work with leading brands and can source specific models on request. Our engineers will calculate your actual load requirements to recommend the correct capacity.
Do you handle earthing for new buildings?
Yes. We design and install complete earthing systems per Oman standards, including earth electrode installation, bonding, and earth resistance testing. We provide a formal test report confirming the system meets the required resistance values.
What is a lightning arrestor and do I need one?
A lightning protection system (LPS) protects your building and equipment from direct lightning strikes by providing a controlled path to earth. It is required for most commercial buildings under Oman regulations, and strongly recommended for any building with sensitive electrical equipment or elevated exposure.
Do you provide commissioning certificates?
Yes. All installations come with formal commissioning and test reports, including load test results, earth resistance test data, and insulation resistance measurements. These documents are required for insurance and regulatory compliance purposes.

Get a Free Quote for Power Infrastructure

Site visit and detailed quotation within 48 hours. No obligation.